Delivering Proven
Results Across Industries

Ducorr has successfully delivered cathodic protection and corrosion mitigation solutions across a wide range of sectors including marine, oil & gas, infrastructure, and industrial facilities. Each project reflects our commitment to engineering excellence, innovation, and long-term durability.

Hero

Proven Results Across Industries

Our track record speaks for itself with measurable outcomes that demonstrate the effectiveness of our cathodic protection solutions.

50+
Years Asset Life Extension
Our solutions extend infrastructure life up to 50 years
150%
Time Savings
Platepro system installation saves 150% time vs standard
30+
Years Protection
Corrosion protection systems lasting 30+ years
12
Countries Served
Global presence across diverse markets
🌍

Global Reach

From the Middle East to Asia, our solutions protect critical infrastructure worldwide

Rapid Deployment

Quick installation and commissioning with minimal disruption to operations

🛡️

Comprehensive Protection

Complete corrosion mitigation from design to long-term monitoring

Our Portfolio of Excellence

Discover how Ducorr has delivered innovative cathodic protection solutions across diverse industries and challenging environments worldwide.

🏗️
Dubai Water Canal

Dubai Water Canal

United Arab Emirates

The Dubai Water Canal changed the face of Dubai and made history as one of the biggest urban transformation in the world. This canal is 3.2km long waterway.

Why Ducorr:

  • Maximize Efficiency
  • Speed up delivery
  • +1 more benefits
🏗️
Marsa Al Seef

Marsa Al Seef

United Arab Emirates

Ducorr deployed the Cathodic protection materials, designed, installed and commissioned for the Marsa Al Seef Marine site project. The proposed development is spread over approximately 1.80km along the Creek and includes generally hotel, retail, marina, underground car park, canal, etc. It covers marine infrastructure and environmental design elements.

Why Ducorr:

  • Flexible project team
  • Easy product application solution
  • +1 more benefits
🏗️
Aqaba Port Development

Aqaba Port Development

Kingdom of Jordan

Ducorr has been the preferred vendor for the design & deployment of cathodic protection for the Aqaba New Port. Ducorr was retained to carry out the detailed design and supply of the cathodic protection system for a combi-wall structure that eventually made up four marine berths. The port configuration consisted of four berths, complete with dry dock facility.

Why Ducorr:

  • Professional on their craft
  • Extending the life of the asset up to 50 years
🏗️
Abu Dhabi National Oil Company (ADNOC) Distribution

Abu Dhabi National Oil Company (ADNOC) Distribution

UAE

Ducorr has completed the deployment of corrosion protection systems at an ADNOC project in Ras Al Khaimah. The system provides corrosion protection for up to 30 years. Platepro system was also used in this project, adding that it was installed in less than three hours which represents an estimated 150% time savings compared to standard systems.

Why Ducorr:

  • 150% time savings compared to standard systems
  • 30 years corrosion protection
  • +1 more benefits
🏗️
Shell Iraq Development Company

Shell Iraq Development Company

Iraq

Ducorr was contracted to design and deploy a Cathodic Protection System for Shell Iraq Petroleum Development (SIPD) to protect its new and existing buried flowlines in Majnoon Oil Field, Iraq. The Majnoon Oil field being development by SIPD has several existing and new buried flowlines and production facilities. These flowlines are buried in very corrosive soil and therefore require protection.

Why Ducorr:

  • Temporary protection during commissioning
  • Protection for corrosive soil conditions
  • +1 more benefits
🏗️
Emirates Aluminum

Emirates Aluminum

United Arab Emirates

The world's largest aluminum smelting plant chose Ducorr for the complete design and deployment of cathodic protection for its underground fuel and water cooling pipelines as well as the cathodic protection of its storage tanks. The systems involved a temporary cathodic protection system for the pipelines, followed by a distributed discrete impressed current system once permanent power was made available.

Why Ducorr:

  • Complete pipeline protection
  • Storage tank protection
  • +1 more benefits
🏗️
Khor Al Zubair

Khor Al Zubair

Republic of Iraq

The existing import/export terminal of the port Khor Al Zubari positioned at the extreme south of Iraq was constructed in the mid 80s. The rehabilitation program undertaken by the Ministry of Port involved the application of protective coating, followed by the implementation of a cathodic protection system for the steel tubular piles. The system covered the protection of four wharfs.

Why Ducorr:

  • Rehabilitation of existing infrastructure
  • Protection of four wharfs
  • +1 more benefits
🏗️
Engro Liquefied Natural Gas Project

Engro Liquefied Natural Gas Project

Pakistan

The LNG development taking in the port city of Karachi involved the laying of gas pipelines that shall be tied into the main gas network. Ducorr was retained for the review of the detailed design, followed by the supply of all cathodic protection equipment and the supply of specialist monolithic isolating joints. The project covered the ICCP of two coated high gas pressure gas pipelines approaching 50km in length.

Why Ducorr:

  • 50km pipeline protection
  • High gas pressure protection
  • +1 more benefits
🏗️
The Pearl Project Gas to Liquids

The Pearl Project Gas to Liquids

State of Qatar

At one time known as the worlds largest construction site, the Pearl GTL project also included the construction of a number of above ground storage tanks. Ducorr was responsible for the plant wide cathodic protection of all storage tanks. The project was designed & deployed on time & on budget.

Why Ducorr:

  • Plant-wide protection
  • Over thirty storage tanks
  • +1 more benefits
🏗️
Dubai Airport Terminal 3

Dubai Airport Terminal 3

United Arab Emirates

The Dubai International Airport has grown to be one of the worlds busiest airports. As part of the durability monitoring of the concrete structure, Ducorr was retained design and install a corrosion monitoring system for the reinforced concrete. The system was installed in select areas of the buried reinforced concrete foundation and shall serve to give an early warning of any early onset of corrosion.

Why Ducorr:

  • Early corrosion detection
  • Reinforced concrete monitoring
  • +1 more benefits
🏗️
Al Khaleej Gas Project

Al Khaleej Gas Project

State of Qatar

The State of Qatar is one of the worlds largest gas producers. As part of its strategic development, the construction of LPG tanks to store large quantities of propane & butane formed the back bone of the Al Khaleej gas project. Ducorr carried out the detailed design & supply of the impressed current system for the reinforced concrete foundation raft & associated piles.

Why Ducorr:

  • LPG tank protection
  • Foundation raft protection
  • +1 more benefits
🏗️
Banana Island by Anantara

Banana Island by Anantara

State of Qatar

Anantara Doha Island Resort is an uninhabited offshore island situated approximately 3½ Kilometers from new Doha International Airport (closest main land point) and 11 Kilometers east of Doha City. The project involves the construction, development and operation of a 5-Star island resort property. The island resort incorporates the use of tubular steel piles that support various structures such as villas or walkways. The steel tubular piles suffered premature severe corrosion a shortly after installation. DUCORR has been retained to propose a durability solution using cathodic protection.

Why Ducorr:

  • Offshore island protection
  • Tubular steel pile protection
  • +1 more benefits